When trenching is required, vertical installations take best advantage of Multi-Flow’s narrow profile.
However, in synthetic turf settings, a nearly impermeable clay base is established and select, porous fill is placed over it. Laying Multi-Flow directly on the dense clay base locates it where the water accumulates. This eliminates the need for trenching. Whether it is new natural turf field construction or the renovation of an existing field, Multi-Flow is a wise choice because:
When soil exhibits sufficient cohesion, a rock wheel trench is an excellent way to excavate a 4 to 6 inch wide trench through the pavement and base materials to the specified depth.
This Rock Wheel Trencher method results in:
Replace pavement after consolidation is complete. It should exceed the thickness of surrounding pavement.
Multi-Flow and Multi-Flow LDVS are property of Varicore Technologies, Inc.
The information contained on this site, including technical drawings, illustrations, pictures, diagrams, etc., are for recommendation only.
It is sole responsibility of determine correct suitability and usage of materials on project.